Key technical guidance
- Define the loading: pedestrian, trolley, forklift, impact, point load and abrasion exposure.
- Identify chemical exposure, cleaning regime, thermal cycling, moisture condition and slip-resistance needs.
- Assess substrate quality, moisture content and surface profile before selecting primers, screeds or resin layers.
- Plan installation around curing windows, shutdown time and phased handover requirements.
How ChemBeton adds value
ChemBeton follows a simple decision route for flooring projects: site survey, moisture assessment, sample panel, system selection, installation control and maintenance guidance.